Improvements to Crystal Fieldhouse 2014:
- New electrical plant, 1600 Amp Service, 400 Volt 3 Phase.
- New lighting system in all public areas.
- New public water and plumbing system.
- Two new hot water boilers.
- Controlled water temperature regulators for all showers.
- Complete remodel of main women's restroom with ceramic tile, granite counter top, and rubber floor.
- All air ducts and ventilation system completely high pressure vacuumed of all foreign material.
- Dehumidifier refurbished.
- All ceiling and walls washed with high-pressure detergent.
- Two coat painting of ceilings, walls of shower rooms, restrooms, corridors, main entry and gathering area.
- Concession area and kitchen refurbished with ceiling tiles, drywall, painting, and granite transaction top.
- New grille, griddle cook top, freezer and refrigeration.
- Concession area: New popcorn maker, hot dog roll out cooker, cappuccino maker, coffee maker, cheese pretzel maker, pizza cookers, exotic soft drink refrigerators.
- New carpet in the general offices.
- Ice available in two rinks.
- Two Zamboni Machines.
- Realignment of 3 flagpoles and display of 3 new flags.
- Parking lot pavement improvement.
- 13 electric motors replaced or refurbished on various items.
Approved,
J.C. Cokley